Qualifying the project before seeking a grant
A leaseholder equipping their own space for personal use is in a different situation than a building preparing collective infrastructure. The number of spaces, available power, connection type, and cost distribution methods all change the setup to be studied.- Individual charging point: a charger primarily powers one resident's space, with individualised funding and usage.
- Shared charging point: a charger can serve multiple users and requires rules for access, metering, and cost allocation.
- Collective infrastructure: the car park is prepared for multiple connections, even if all spaces are not equipped on the same day.
What the ADVENIR scale provides for in 2026
For collective residential buildings, the ADVENIR programme has announced a new scale for applications from 1 April 2026. Individual charging points are subsidised at 50%, up to a limit of €1,000 excl. VAT. Shared charging points are subsidised at 50%, up to a limit of €1,660 excl. VAT.For collective infrastructure, the announced aid is 50%, with a cap of €12,500 excl. VAT for up to 100 spaces. Roadworks and outdoor cable routing solutions have an additional announced cap of €8,000 excl. VAT for up to 100 outdoor spaces. These amounts are caps: eligibility, eligible expenses, and the reference date depend on the actual application.
The date to check varies by scheme. For collective infrastructure, ADVENIR specifically considers the date of the general meeting vote; for individual and shared points, the date the file is signed may determine the applicable scale. Consult the ADVENIR scale published for 2026 before assuming any amount is guaranteed.
Presenting the project to the managing agent and the general meeting
A resident's request, the installation of a charger in a private space, and the creation of collective infrastructure do not require the same resolution. The file must specify who is carrying out the work, which common areas are affected, who pays for the energy, and how future users will be managed.The Service-Public website distinguishes between the decision to equip private spaces, which requires a simple majority in the case described, and the modification of electrical installations to allow individual metering, which may require an absolute majority. The managing agent must confirm the appropriate resolution for the building's configuration.
Comparing the grant and the remaining budget
A grant does not automatically cover all project items. Before comparing two quotes, ask for the breakdown corresponding to the charger, protection devices, cabling, connection, collective infrastructure, outdoor works, inspection, and maintenance. Also check the remaining share to be paid by the leaseholder and any recurring fees.Top tip
A grant amount announced in a simulation is not guaranteed funding. The quote, beneficiary, schedule, and submitted documents must match the chosen scheme.
A grant amount announced in a simulation is not guaranteed funding. The quote, beneficiary, schedule, and submitted documents must match the chosen scheme.
Preparing a complete file
To avoid delays, gather the following before applying:- description of the car park, number of spaces, and users involved;
- proposed connection diagram and routing constraints;
- detailed quote from an IRVE-qualified installer;
- the decision or minutes of the general meeting when required by the setup;
- planned breakdown between infrastructure, charger, energy, supervision, and maintenance;
- dates of the quote, signature, application, and start of work.